Hexagon Measurement      Systems

No matter what Hexagon measurement equipment or software you use, we want to hear your ideas and suggestions on how we can improve.

  • Your feedback and voting will benefit the majority of users.
  • You have 10 votes which you can allocate to your own or other users ideas.
  • We will focus on trying to realize the top voted items in our future products.

Thanks for your assistance in helping us shape the future.

+1

Circle evaluation with constraint

Sonny Setyawidjaya منذ 8 سنة تم التحديث من قبل neil kay منذ 5 سنة 0

Found the constraint on radius/diameter of Circle, but need the constraint activated on the center of circle, to calculate actual radius/diameter on very small portion of circle.

+1

Option to remove Datum feature with MMC from report

Jonny منذ 8 سنة تم التحديث من قبل Rob Jensen منذ 5 سنة 1

When reporting features to Datums with MMC, the position of the features measured tend to always be zero, while the Datums the features are referenced to have a measurement? why is this? can the datums not be removed so only the features being measured show a measured value.

Image 79

+1

Collision List Improvement

Kingsld1 منذ 8 سنة تم التحديث من قبل neil kay منذ 5 سنة 2

After Collision Detection has been run have only the Feature ID's on the Collision List appear on the Graphics Display Window.    This will cut down the amount of searching for a feature that occurs.  


Better yet, have collision detection automatically run as you offline program.

+1
قيد المراجعة

One password to access all Hexagon websites.

Filips منذ 8 سنة تم التحديث من قبل neil kay منذ 5 سنة 2

One password to access all Hexagon websites.

+1

Scan segment construction from CAD surface

michael lee منذ 8 سنة تم التحديث من قبل neil kay منذ 5 سنة 2

Instead of clicking start/end points for a scan segment to construct a feature, I would like to be able to click a CAD surface so that all hits that cross that surface are included in the feature construction

+1

Turn off machine servos function

Al Metzel منذ 8 سنة تم التحديث من قبل neil kay منذ 5 سنة 0

 A function to allow the program to turn off the machine servos would be very useful as operators often forget to do so when exiting an inspection program. This was an option in MeasureMax.

+1

Recalculate actual values of measurements after probe qualification

jleond منذ 8 سنة تم التحديث من قبل neil kay منذ 5 سنة 0

PC-DMIS ability to recalculate actual values of current measured values in case of probe re-qualification, i. e. when using a probe angle that wasn't qualified a long time ago and it was used in a routine that takes a long time to run.

+1
تم الإنجاز

Probe Options

David Courtney منذ 8 سنة تم التحديث من قبل neil kay منذ 4 سنة 5

I want to be able to calibrate probes and assign probes to the probe change rack within the Inspect Interface. I want to be able to manage probe calibrations for each program so that when I click on a measurement routine a button becomes available to calibrate all probes and angles for the associated program. Then there would be an option to manage the probe rack if needed; to assign the specific probes in the routine to the probe rack slots if not already assigned.

+1
تم الإنجاز

Search Routine Directory Subfolders within Side Bar

David Courtney منذ 8 سنة تم التحديث من قبل neil kay منذ 5 سنة 1

I want to be able to navigate within the sidebar area to inspection routines located within subfolders of the specified directory. I understand that I can go into the settings folder and call up a specific folder but it would be nice to be able to navigate the file directory within the side bar area, like Windows Explorer.

+1
تم الإنجاز

Allow configuring of the PC-DMIS version to start instead of relying on "last version run as admin"

anders isaksson منذ 8 سنة تم التحديث من قبل neil kay منذ 5 سنة 1

In many situations it would be better to explicitly tell INSPECT which version of PC-DMIS to run, instead of relying on the "last version that was run as administrator".

خدمة دعم العملاء من خلال UserEcho